An energy storage system was filed for 265 Belknap Rd, Framingham. This could help manage electricity use and support grid stability.

The applicant is Tesla Energy Operations. The permit number is FIR250581. No details about the system's size or purpose were listed.

Next steps include review by local authorities. The system may be installed soon if approved. No further details were provided.