Four electrical and building permits have been filed for The Green at 9 and 90, a high-rise residential complex at 1610 Worcester Rd in Framingham. The permits signal a major infrastructure overhaul for the 402-bedroom, 306-bathroom complex built in 1966.
These filings are part of a broader trend: ZIP code 01702 saw 66 high-significance building permits filed between January 12 and February 25, 2026. Most of these permits relate to infrastructure upgrades, not new construction. At The Green at 9 and 90, the work includes electrical permits (BLDE 26-264) and a building permit (BLD 26-347), with additional electrical permits filed earlier in February.
Similar infrastructure work is happening elsewhere in Framingham, including a Tesla Energy solar installation at 67 Croydon Rd and a permit for a duplex at 14 Berry St. Residents near Worcester and Phelps Roads should expect increased construction activity in the coming months as the city modernizes aging infrastructure.
This analysis is based on public municipal records. Visit the Framingham city portal for more details: framinghamma.portal.opengov.com