Tesla Energy filed a residential solar permit for 12 MICHAUD DR, Framingham. This permit allows the installation of solar panels on a residential property.

Tesla Energy applied for the permit. The project involves solar panel installation. Permit number BLD180969 was filed on May 23, 2018.

The next step is for the city to review the permit. The status is not specified. Residents may see changes to their property.