The Green at 9 and 90 is undergoing a massive systemic overhaul, with 53 new permits filed at the property in the last 90 days.
This surge pushes the total number of filings for the South Framingham complex past 120 since early 2026. For residents and commuters near Route 9, the volume of paperwork indicates a coordinated modernization of the aging high-rise rather than simple maintenance.
The work centers on the 300,000-square-foot residential complex located at 1610 Worcester Rd. The site contains buildings dating back to 1966 and 1974. Developer Angelo Vigliotta and Galaxy Electrical Contractors are leading the effort, which has already seen a heavy concentration of electrical infrastructure upgrades.
Between January and April 2026, the complex generated 71 filings, 42 of which were specifically for electrical work. The current wave of 53 permits represents a 4.5x increase over the property's historical filing baseline, confirming a multi-phase strategy to replace the infrastructure of the residential towers.
This analysis is based on public municipal records. Residents can find more details by visiting the Framingham city portal at framinghamma.portal.opengov.com.