Trench work was filed for 234 Union Ave, Framingham. This means construction will involve digging below ground level to install utilities or infrastructure.

Ellingwood Construction Incorporated filed the request. The work involves trenching without specific details about the scope. No permit number was provided.

Next steps include reviewing the application and determining if additional information is needed. The status is not specified, so further details may be required before approval.